The Metro design quality and the construction schedule would be affected due to the lack of simple and practical software on finetuning design of the line slope of Metro works. As a result, double side control method is proposed. The determination of the double side control lines of the elevated bridges and tunnels of Metro works is systematically presented on basis of the survey data, the Metro demarcation data and the bridge data. The Metro line design software is applied in the finetuning of the line slope of Metro works, which achieves automatic and visual finetuning design of line slope of Metro works and improves the working efficiency. The method has been successfully used in the finetuning design of the slope of the airport line of Nanjing Metro. The paper can provide reference for the finetuning design of similar works in the future.
Key words: double side control method, finetuning of line slope, demarcation, tunnel, elevated bridge
LIU Yanchen. Application of Double Side Control Method in Finetuning Design of Line Slope of Metro Works[J]. Tunnel Construction, 2014, 34(4): 339-342.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.04.008
http://www.suidaojs.com/EN/Y2014/V34/I4/339
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station