ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (9): 895-899.DOI: 10.3973/j.issn.1672-741X.2014.09.012
Previous Articles Next Articles
JI Weiguo
Received:
Revised:
Online:
Published:
Abstract:
The running tunnel from Xi’an Road Station to Jiaotong University Station on Line 2 of Dalian Metro is on smallradius curves. The shield for the mentioned running tunnel is to be launched under the condition of one single shaft. In the paper, comparison and contrast is made between separate shield launching program and integral shield launching program in terms of progress, cost and feasibility, and it is finally determined that integral shield launching program is to be adopted. In the launching of the shield, selfmade belt conveyor and selfmade segment feeder are used, and the launching direction and the driving attitude of the shield are well controlled, so as to facilitate the mucking, segment delivery and shield attitude control in the launching. In the end, successful shield launching is achieved for the running tunnel on smallradius curves.
Key words: Dalian Metro, running tunnel on smallradius curve, shield, single shaft, separate shield launching program, integral shield launching program, selfmade belt conveyor, attitude control
CLC Number:
U 45
JI Weiguo. Shield Launching Technology for Running Tunnel on Smallradius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro[J]. Tunnel Construction, 2014, 34(9): 895-899.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.09.012
http://www.suidaojs.com/EN/Y2014/V34/I9/895
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel