NoDig construction in the city might still encounter of difficulties. However, the difficulties or obstacles, which might cause schedule delays and damage to the pipes. This study considered different overcut range, sticking position, resistance, jacking force, and the location of jacks, etc., for the straight line and curved pipe-jacking. The ABAQUS finite element software was applied for threedimensional numerical simulations for straight line pipejacking with different difficult situations.
Key words: nodig, pipejacking, numerical analysis, overcut, stuck
CLC Number:
TU 47
Shou K J, Hsieh C Y. Analysis of Overcut and Stuck Effects on Interaction between Soilpipe and Ground when PipeJacking in Gravel Formations[J]. Tunnel Construction, 2014, 34(增刊): 48-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.S.008
http://www.suidaojs.com/EN/Y2014/V34/I增刊/48