Abstract:
The ground is often affected by the construction of overlapping shield tunnels, as a result, it is necessary to study the mechanical behavior and deformation rules caused by the interaction in the construction of overlapping tunnels. In the paper, the rules of the deformation of surrounding ground induced by the construction of the overlapping shield tunnels on Lintong Line of Xi’an Metro, as well as the rules of the influence of the construction of the left tunnel tube on the constructed right tunnel tube, are studied. The result shows that:1) After the construction of the overlapping tunnel is completed, the ground surface settlement trough induced by the construction of the tunnels, which takes a belt shape, is distributed alone the tunnel. 2) The ground settlement increases as the degree of the vertical overlapping magnitude increases; the maximum ground surface settlement reaches 9.79 mm at the fully vertical overlapping point; 3) The influence of the construction of the left tunnel tube on the constructed right tunnel tube takes the form of lateral pushing and increasing the strata supplementary stress. At the vertically overlapping section, such influence can be ignored. The maximum horizontal displacement of the right tunnel tube induced by the construction of the left tunnel tube reaches 175 mm, and the maximum settlement of the right tunnel tube reaches 1.97 mm.
Key words: Xi’an Metro, overlapping tunnel, shield, settlement, deformation, displacement, numerical calculation
CLC Number:
U 459.3
TANG Mingming, LIU Miao. Case Study on Rules of Deformation Caused by Construction of Overlapping Shield Tunnels of Xi’an Metro[J]. Tunnel Construction, 2015, 35(2): 115-120.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.02.003
http://www.suidaojs.com/EN/Y2015/V35/I2/115
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel