ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (7): 709-715.DOI: 10.3973/j.issn.1672-741X.2015.07.015
Previous Articles Next Articles
LI Yongsheng
Received:
Revised:
Online:
Published:
Abstract:
In the paper, the tunneling ventilation management flowchart is proposed and analyzed. The causes for and harms of the problems that may occur in the tunneling ventilation management are analyzed in terms of technology management and execution management, and countermeasures are recommended. It is concluded that the technology management is essential for the tunneling ventilation management and that the target of the tunneling ventilation management is realized mainly by execution management. The purpose of the paper is to remind the tunneling contractor to pay more attention to the tunneling ventilation management so as to ensure good tunneling ventilation performance.
Key words: tunnel, tunneling ventilation, management process, technology management, execution management, countermeasure
CLC Number:
U 455.1
LI Yongsheng. Discussion on Tunneling Ventilation Management[J]. Tunnel Construction, 2015, 35(7): 709-715.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.07.015
http://www.suidaojs.com/EN/Y2015/V35/I7/709
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station