Abstract:
The lakecrossing section of Slender West Lake Tunnel in Yangzhou is constructed by a 14.93 m slurry shield. The shield has bored through 1 275 mlong stiff plastic expansive clay strata successfully and has overcome a series of technological difficulties such as cutterhead blocking, slurry chamber and slurry pipe blocking, huge cutter head torque, low shield boring speed and difficulty in slurry separation. So far the tunnel is the largest tunnel in China bored by slurry shield in expansive clay strata. In the paper, the effective slurry circulating and muckingout technology when boring through the fullface clay strata, the technology to modify the shield to adapt to the expansive soil strata, the shield boring technology and the excavation face stability keeping technology in the stiff plastic clay strata, dynamic welding technology under 0.42 MPa pressure, accurate shield arriving technology on smallradius curve and rapid construction technology for the internal structures of the twostorey shieldbored tunnel are summarized. The paper can provide reference for the development of the slurry shield boring technology in expansive clay strata in China.
Key words: Slender West Lake Tunnel in Yangzhou, stiff plastic expansive clay strata, shield adaptability improving, maintenance under hyperbaric condition
CLC Number:
U 45
WANG Chengzhen. Key Technologies for Construction of Shieldbored Slender West Lake Tunnel in Yangzhou[J]. Tunnel Construction, 2015, 35(8): 828-833.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.08.013
http://www.suidaojs.com/EN/Y2015/V35/I8/828