Case Study on Construction of Shallow Metro Tunnel by Double Side Heading Method with Core Rock Kept
LI Xiangdong1, WANG Wei2
(1. Qingdao Metro Group Co. Ltd., Qingdao 266071, Shandong, China; 2. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
LI Xiangdong, WANG Wei. Case Study on Construction of Shallow Metro Tunnel by Double Side Heading Method with Core Rock Kept[J]. Tunnel Construction, 2015, 35(10): 1060-1065.