The structural crosssection survey of Metro tunnels is an important step in track laying. The conventional survey method has such disadvantages as huge site workload, huge indoor workload, complex indoor data processing and low data calculation efficiency. For the purpose of improving the survey efficiency and minimizing the instrument cost and the labor cost, total station is installed at the control point of the Metro tunnel, the coordinates of each feature point on each structural crosssection of the Metro tunnel are measured by means of 3D coordinate survey method, and the deviations in the structural crosssections are calculated by means of C# programming language. The application of the mentioned survey method shows that, due to the application of the survey method, the site workload is reduced and the efficiency of the indoor data processing is improved. The paper can provide reference for similar projects in the future.
Key words: Metro tunnel, crosssection survey, C# programming, Autocad.Net
CLC Number:
U 452.1+3
HU Leiming. Discussion on Survey of Structural Crosssection of Metro Tunnel and Programming of Data Processing[J]. Tunnel Construction, 2015, 35(10): 1077-1081.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.10.017
http://www.suidaojs.com/EN/Y2015/V35/I10/1077
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network