ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (12): 1264-1270.DOI: 10.3973/j.issn.1672-741X.2015.12.005

Previous Articles     Next Articles

Prediction and Construction Safety Control for Shield Undercrossing Moat Arch Bridge in Loess Area by means of FLAC3D

CAO Zhen1, YANG Feng2,3, ZHANG Ning1,3   

  1. (1. Xi’an Subway Co. Ltd., Xi’an 710018, Shaanxi, China; 2. China Railway 15th Bureau Group Co., Ltd., Shanghai, 200070, China; 3. Xi’an University of Science and Technology, Xi’an 710054, Shaanxi, China)
  • Received:2015-02-12 Revised:2015-05-29 Online:2015-12-20 Published:2016-01-08

Abstract:

It is of great importance to study the safety control technology for shield boring in loess. The shieldbored tunnels of Xi’an Metro, which are located in loess strata, have to cross underneath complex ground surface conditions, cultural relics, buildings and structures. The shieldbored tunnel from Anyuanmen station to Beidajie station on Line 2 of Xi’an Metro crosses underneath a moat arch bridge. In the paper, the deformation of the moat arch bridge caused by shield boring is analyzed by means of FLAC3D program. The calculation result shows that the ground below the moat arch bridge has to be consolidated before shield boring, so as to ensure the safety and stability of the bridge. It is proposed that sand bags should be piled in the moat arch bridge zone and Soletanche grouting should be conducted behind the foundation of the bridge. The site measurement shows that the deformation of the moat arch bridge is within the allowance scope and the countermeasures taken are rational and effective.

Key words: loess area, shield tunnel, moatspanning arch bridge, numerical simulation, prevention and control