Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S1): 41-47.DOI: 10.3973/j.issn.1672-741X.2015.S1.009
Previous Articles Next Articles
YANG Sanlong, WANG Haijiang
Received:
Revised:
Online:
Published:
Abstract:
Ground surface settlement is one of the most important parameters that should be well controlled in shield tunneling. During the construction of Line 1 of Shijiazhuang Metro, the settlement on some specific days reaches the alert value, however, the accumulated settlement value does not reach the alert value, although the shield boring parameters meet the design requirements. In the paper, the causes for the ground surface settlement are analyzed in terms of excavation chamber pressure, simultaneous grouting, grout performance and ground stability, with the data of the running tunnel from Stadium station to Beisong station measured on June 15, 2014 as examples. Finally, the ground settlement under the fine silt sand strata, finemedium sand strata and mediumcoarse sand strata in Shijiazhuang are analyzed.
Key words: Shijiazhuang Metro, shield, surface settlement
CLC Number:
U 45
YANG Sanlong, WANG Haijiang. Analysis on Ground Surface Settlement Caused by Shield Tunneling: Case Study on Line 1 of Shijiazhuang Metro[J]. Tunnel Construction, 2015, 35(S1): 41-47.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S1.009
http://www.suidaojs.com/EN/Y2015/V35/IS1/41
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel