[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
LI Shenkui.
Numerical Analysis and Model Test of Hourglassshaped
Karst Collapse in Wuhan Area
[J]. Tunnel Construction, 2020, 40(7): 981-987.
|
[3] |
ZHAN Chao.
Experimental Effect Prediction of Ground Conditioning
of Water rich Sandy Stratum Based on BP Neural Network
[J]. Tunnel Construction, 2020, 40(7): 988-0996.
|
[4] |
ZHANG Li, SU Rui, HE Chuan, FENG Kun, FANG Ruoquan, XU Peikai.
Fullscale Experimental Study on Bending
Performance of Segmental Joints of Large
Crosssection Shield Tunnel under Pure Compressive Bending Condition
[J]. Tunnel Construction, 2020, 40(7): 997-1003.
|
[5] |
WANG Ruochen, ZHU Yong, DI Cheng, HUANG Hua.
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou
Railway
[J]. Tunnel Construction, 2020, 40(7): 1029-1034.
|
[6] |
ZHANG Longguan, LI Zhigang, TAN Jiang.
Launching and Receiving Technology of Large Crosssection Horseshoeshaped
Shield Used in Baicheng Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1041-1048.
|
[7] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[8] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[9] |
LI Zhijun, GUO Xinxin, MA Zhenwang, YANG Tielun, XU Jianqiang.
Research Status and Highstrength
Prestressed Primary (type)
[J]. Tunnel Construction, 2020, 40(6): 769-782.
|
[10] |
SUN Zhenchuan, QIAN Tongtu, REN Yingying, CHU Changhai, ZHOU Zhenjian.
Study on Key Technologies and Application of
Engineering Big Data Management
Platform of Tunnel Boring Machine
[J]. Tunnel Construction, 2020, 40(6): 783-792.
|
[11] |
CHEN Ziquan, KOU Hao, YANG Wenbo, HE Chuan, LI Yonglin.
Cases Analysis of Mechanical Behavior Characteristics
of Tunnel Supporting Structure in Mountainous Areas in
Southwest China
[J]. Tunnel Construction, 2020, 40(6): 800-812.
|
[12] |
HAN Huaxuan.
Study on Selection of Tunnel Design Standard for JakartaBandung Highspeed Railway Project in
Indonesia
[J]. Tunnel Construction, 2020, 40(6): 845-858.
|
[13] |
HUANG Wei.
Optimization Design of Segmental Structure of Large
Crosssection Rectangular Pipe jacking Tunnel
[J]. Tunnel Construction, 2020, 40(6): 859-867.
|
[14] |
LI Yabo, LI Jing.
Design of Lshaped Joint Concrete Lining
Formwork Trolley
[J]. Tunnel Construction, 2020, 40(6): 898-904.
|
[15] |
LUO Duhao, JIANG Si, LIU Jianyou.
Improvement Technology of Bearing Capacity of
Prestressed Anchor Cable in
Large span Tunnel: a Case Study on Badaling Great Wall Station
[J]. Tunnel Construction, 2020, 40(6): 873-879.
|