ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2016, Vol. 36 ›› Issue (8): 1016-1022.DOI: 10.3973/j.issn.1672-741X.2016.08.019

Previous Articles    

Application of Largediameter Hard Rock Tunnel Boring Machine (TBM) to TBM3 Section of No. 4 Bid of Songhua River Water Conveyance Project in Middle Jilin Province

HE fei, ZENG Xiangsheng, QI Zhichong   

  1. (China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China)
  • Received:2015-11-25 Revised:2016-03-17 Online:2016-08-20 Published:2016-08-17

Abstract:

The characteristics and main design parameters of largediameter hard rock TBM used in No. 4 Bid Section of the Songhua River Water Conveyance Project are analyzed. The rock strata of the project are complicate; there are many fracture zones and limestone and quartz locally; and it requires highperformance of TBM cutterhead and cutting tools. As a result, the TBM cutterhead is manufactured by 270 mm thickness plate; the nonlinear distance among cutting tools is 82-90 mm; effective primary supporting system and material transportation platform are designed; and advance geology prediction system is adopted. The construction practice shows that the TBM cutterhead designed is reliable and highefficient; the supporting efficiency of TBM in bad geological conditions is high; and the advance geology prediction results are reliable.

Key words: Songhua River Water Conveyance Project, largediameter hard rock tunnel boring machine (TBM), cutterhead manufactured by thick plate, advance geology prediction

CLC Number: