Tunnel Construction ›› 2016, Vol. 36 ›› Issue (11): 1302-1309.DOI: 10.3973/j.issn.1672-741X.2016.11.003

Previous Articles     Next Articles

Comparison between Bench Method and Fullface Method for  Ping’an Soft Rock Tunnel on ChengduLanzhou Railway

XIAN Guo   

  1. (ChengduLanzhou Railway Co., Ltd., Chengdu 610036, Sichuan, China)
  • Received:2016-07-08 Revised:2016-11-03 Online:2016-11-20 Published:2016-11-30

Abstract:

Comparison between bench method and fullface method (including invert arch) for soft rock section of Ping’an Tunnel on ChengduLanzhou Railway is made in terms of surrounding rock deformation, primary support stress and construction organization by using numerical simulation, theoretical calculation and site test. The study results show that: 1) The stability of surrounding rock of tunnel constructed by bench method is superior to that constructed by fullface method; and the accumulated deformation of tunnel constructed by fullface method is smaller than that constructed by bench method. 2) The sizes of shear zone and tensile failure zone of tunnel constructed by 2 methods are almost the same. The construction quality of tunnel constructed by fullface method is easier to control. 3) The fullface method is superior to bench method in terms of labor and construction schedule.

Key words: soft rock tunnel, phyllite, bench method, fullface method (including invert arch), construction organization