ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2016, Vol. 36 ›› Issue (12): 1492-1499.DOI: 10.3973/j.issn.1672-741X.2016.12.013
Previous Articles Next Articles
LIU Zhiguang, ZHANG Jinwei, DUAN Wanling
Received:
Revised:
Online:
Published:
Abstract:
The transfer among newlybuilt Metro station, existing transfer station and planning Metro station becomes more and more common with the rapid development of urban rail transit; and it becomes more and more important to realize integration between rail transit and urban space. The transfer scheme among Jinrongjie Station, existing transfer station and planning station of Beijing Metro is analyzed by site investigation and static calculation preliminarily; and then it is assessed by dynamic simulation of passenger flow. Two transfer schemes and some suggestions are given. The results can provide reference for design of urban space integration of similar projects in the future.
Key words: Beijing Metro, rail transit, transfer station, existing station, planning station, Metro station rehabilitation, urban space integration
CLC Number:
U 45
LIU Zhiguang, ZHANG Jinwei, DUAN Wanling. Study of Transfer Scheme among Jinrongjie Station, Existing Transfer Station and Planning Station of Beijing Metro[J]. Tunnel Construction, 2016, 36(12): 1492-1499.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.12.013
http://www.suidaojs.com/EN/Y2016/V36/I12/1492
Research on Dynamic Benchmark Rate of Return of PPP Rail Transit Project