ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (4): 476-485.DOI: 10.3973/j.issn.1672-741X.2017.04.014
Previous Articles Next Articles
GUI Jinxiang, LI Jianqiang, WANG Jialiang
Received:
Revised:
Online:
Published:
Abstract:
In order to learn the distribution, content, diameter and strength of boulders and machine tool coefficient, nature intensity and hydrogeological characteristics of boulders and pebbles met on west extended section of Phase Ⅱ of Chengdu Metro Line No. 4, a series of methods, i.e. insitu well group dewatering, manual excavation of largediameter exploratory well, reinforced concrete retaining wall, underground geological compilation and measuring, site K30 test, intensity tests, sampling and hydrogeological tests of boulders, are carried out. The construction method selection, tunnel buried depth and shield type selection are analyzed; the potential geotechnical issues occuring during shield tunneling are predicted. Finally, some countermeasures and surveying method for boulders and pebbles are suggested.
Key words: Chengdu Metro, shield tunnel, special survey, features of boulders and pebbles, shield type selection
CLC Number:
U 452.1
GUI Jinxiang, LI Jianqiang, WANG Jialiang. Special Survey and Analysis of Boulders and Pebbles of Shield Tunnel of Phase Ⅱ of Chengdu Metro Line No. 4[J]. Tunnel Construction, 2017, 37(4): 476-485.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.04.014
http://www.suidaojs.com/EN/Y2017/V37/I4/476
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition