ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (5): 586-592.DOI: 10.3973/j.issn.1672-741X.2017.05.010
Previous Articles Next Articles
GUO Boqian
Received:
Revised:
Online:
Published:
Abstract:
The influencing factors on surrounding rock of a highspeed railway tunnel under construction are analyzed in terms of initial stress, rock structure and ground water on basis of geological conditions. The characteristics and mechanism of surrounding rocks deformation of tunnel with extremely high geostress are systematically analyzed by comprehensive method of theory analysis and site monitoring feedback in terms of characteristics, directivity, accumulated variation, deformation velocity and timeliness of timedependent curves of monitoring data, site deformation of surrounding rock, tunnel construction influence and deformation difference between two deformation sections. Some conclusions are drawn as follows: 1) The stress release of surrounding rock with extremely high geostress needs time, the stress release velocities of different surrounding rocks are different, and blasting construction will cause disturbance to surrounding rock and speed up the stress release. 2) The deformation laws of surrounding rocks vary as the geological conditions vary. 3) The deformation destruction of layered surrounding rock will form some zones, i.e., destruction zone, collapse, sliding, tension crack, bending and breaking. 4) The deformation characteristics of tunnel surrounding rocks are mainly determined by extremely high geostress and rock structure; and the deformation of tunnel primary support can effectively reflect the deformation characteristics of tunnel surrounding rocks to a certain extent.
Key words: tunnel, extremely high geostress, surrounding rock deformation, geological characteristic, monitoring measurement
CLC Number:
U 452.1+2
GUO Boqian. Geological Characteristics of Tunnels with Extremely High Geostress and Study of Surrounding Rock Deformation Mechanism[J]. Tunnel Construction, 2017, 37(5): 586-592.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.05.010
http://www.suidaojs.com/EN/Y2017/V37/I5/586
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station