ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2017, Vol. 37 ›› Issue (7): 845-850.DOI: 10.3973/j.issn.1672-741X.2017.07.010

Previous Articles     Next Articles

Characteristic Analysis and Treatment of Construction Wastewater of Tianmushan Tunnel

LIU Wei1, FU Hailu2,*, GENG Wei1, PANG Wei1, ZENG Aibin3, GUAN Baohong4   

  1. (1. Hangzhou Branch of China Railway Tunnel Group Co., Ltd., Hangzhou 310030, Zhejiang, China; 2. China Jiliang University, Hangzhou 310018, Zhejiang, China; 3. Hangzhou Wanxiang Polytechnic, Hangzhou 310023, Zhejiang, China; 4. Zhejiang University, Hangzhou 310058, Zhejiang, China)
  • Received:2017-03-17 Revised:2017-06-09 Online:2017-07-20 Published:2017-07-26

Abstract:

The entrance of Tianmushan Tunnel is adjacent to the national scenic area of “Xin’an RiverFuchun RiverQiandao Lake”. The protection of the safety of local ecological environment and drinking water is very important. As a result, the characteristics of construction wastewater of Tinmushan Tunnel are analyzed; the results show that the suspended solids (SS) and power of hydrogen (pH) in wastewater exceed the limit. The heavy metals related to the engineering geology are detected in the wastewater, which do not exceed the limit except mercury (Hg) and nickel (Ni) in some of water samples. The wastewater treatment method of “primary setting + coagulation + sediment + filtration” is adopted. The suspended solids with large particle size can be removed by primary setting process; and the fine particulate matter and the heavy metals can be removed by coagulation and sediment process. The application results show that the quality of construction wastewater after treatment can meet relevant requirements; meanwhile, the treatment cost of the wastewater per cubic meter is RMB 0.51, so as to show beffer economical benefit.

Key words: Tianmushan Tunnel, tunnel construction wastewater, wastewater treatment, heavy metal

CLC Number: