Along with the promoting of The Belt and Road initiative, the construction of transnational transportation channel becomes one of the key links in the implementation of the initiative. However, the existing experience can not fully meet the construction requirement of transnational transportation and urban infrastructure under complex geological conditions. The necessity and benefit of ChinaNepalIndia Railway Channel passing through Nepal and linking China and India are analyzed; and then the preliminary design of the railway is completed. The construction difficulties, including large slope, complex geological structure, poor infrastructure construction condition and bad construction environment, a large number of long and deep tunnels and largespan bridges and complex environment and climate conditions, are summarized. Furthermore, the construction feasibilities of tunnels and bridges along the line are analyzed; meanwhile, some construction advices, i. e. mainly TBM method and supplemented drilling and blasting method and proper construction method selection for bridge scheme, are proposed.
Key words: The Belt and Road, ChinaNepalIndia Railway Channel, route design, feasibility analysis, tunnel, bridge
CLC Number:
U 45
BAI Yun, SHI Zhenming, SHI Xuefei. Preliminary Design and Construction Feasibility Analysis of ChinaNepalIndia Railway Channel[J]. Tunnel Construction, 2017, 37(10): 1201-1208.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.10.001
http://www.suidaojs.com/EN/Y2017/V37/I10/1201
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station