Prediction of Shield Tunnel Segment Upfloating  Caused by Formation Rebound

LYU Qianqian1, 2, ZHOU Jianjun1, 2, YANG Zhenxing1, 2, WANG Liming1, 2, LIU Jingjin3   

  1. (1.State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China;  2.China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China; 3. Department of Civil Engineering, Tianjin University, Tianjin 300072, China)
  • Received:2017-07-24 Revised:2017-08-28 Online:2017-12-30 Published:2018-02-25

Abstract:

The mechanism analysis of segment upfloating during construction is conducted. The main cause of segment upfloating in softandweak stratum is formation rebound induced by stratum stress redistribution; the variation rule of tunnel upfloating amount and the influence of stratum characteristics on segment upfloatation are analyzed by dynamic model of tunnel excavation; the elasticity modulus and the amount of segment upfloating present exponential correlation; the influence of elastic modulus on segment upfloating is far greater than that of the formation cohesion strength and internal friction angle; the formation resilience force caused by shield tunneling, the amount of segment upfloating and the affected height of tunnel upfloating are calculated by force balance theory; finally, the feasibilities of the formulas are verified by case study of Shiziyang Tunnel. The results can provide a new theory and method for predicting the shield tunnel segment upfloating caused by formation rebound.

Key words: segment upfloating, weak stratum, elasticity modulus, cohesive strength, internal friction angle