Study of Parameters of Grouting Circle for Deepditch Drainage Tunnel in Waterrich Karst Area

MA Qing1, LUO Lusen1, YANG Junsheng2, ZHANG Zheng3, LI Linyi2   

  1. (1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China; 2. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 3. Changjiang Survey, Planning, Design and Research Co., Ltd., Wuhan 430010, Hubei, China)
  • Received:2018-04-12 Revised:2018-06-26 Online:2018-11-20 Published:2018-12-02

Abstract:

In order to rationally determine the characteristic parameters of tunnel grouting circle under drainage mode of deep ditch, the rationality of the grouting circle parameters of a tunnel in waterrich karst area is discussed by a fluidsolid coupling calculation model based on software FLAC3D, and the influencing laws of thickness and permeability of grouting circle on water gushing volume, water pressure of lining structure and structural safety are studied. The study results show that: (1) The water pressure of lining and the water gushing volume can be reduced, and the structural safety can be guaranteed by rationally increasing the thickness of the grouting circle or reducing the permeability of the grouting circle. (2) According to the simulation results and similar projects, the thickness of grouting circle of 56 m and the permeability coefficient of 2×10-6 cm/s are recommended, respectively; and the grouting parameters should be rationally determined according to actual technoeconomic comparison results.

Key words: tunnel, waterrich karst area, deep drainage ditch, parameters of grouting circle, thickness of grouting circle, permeability of grouting circle, water pressure of lining, fluidsolid coupling calculation