ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2018, Vol. 38 ›› Issue (S2): 247-252.DOI: 10.3973/j.issn.2096-4498.2018.S2.033

Previous Articles     Next Articles

Study of Designed Scheme of Ventilation Channel of Emergency Rescue Station of Railway Tunnel Portal

YANG Baihong, ZHAO Dongping, WANG Luwei   

  1. (School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China)
  • Received:2018-05-28 Revised:2018-10-20 Online:2018-12-30 Published:2019-01-30

Abstract:

In this paper, 3 layout schemes of ventilation channel of emergency rescue station of a railway tunnel, i.e. fans in main tunnel, intermediate ventilation channel in main tunnel and separated ventilation channel in rescue parallel heading, are studied and compared. The results show that: (1) The scheme, jet fans in main tunnel, is the optimum. (2) The separated ventilation channel in rescue parallel heading can be adopted when considering the influence of aerodynamic load of highspeed trains on jet fans. (3) The shorter the ventilation channel, the lower the cost and more convenient the construction when adopting intermediate ventilation channel in main tunnel.

Key words: railway tunnel portal, emergency rescue station, disaster prevention Ventilation, ventilation channel

CLC Number: