Cause Analysis and Treatment Measures for OverallCarryingSoil Effect of Shallowburied Rectangular Pipe Jacking

DOU Xiaotian, WANG Hekun, CAO Weiming, WANG Jinbo, ZHAO Liyong, RAN Jingpeng   

  1. (The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2018-06-29 Revised:2019-01-31 Online:2019-03-20 Published:2019-04-03

Abstract:

In order to avoid the overallcarryingsoil failure in shallowburied rectangular pipe jacking project, the causes for the actual overallcarryingsoil failure are analyzed based on the existing research results and the theory of the overallcarryingsoil, by taking an underground parking lot project for example. Firstly, by analyzing the characteristics of the overallcarryingsoil failure phenomenon of the project site, it is concluded that the adjacent tunnel construction, attitude adjustment, pipe jacking machine stop, and antifriction mud failure are the main causes. And then the overallcarryingsoil treatment measures, i.e. grouting pipeline investigation, pileloading at the carryingsoil position in front of the cutterhead, borehole water injection at the carryingsoil position, and partition wall, etc.〖KG-*3〗, are adopted and described, respectively. Finally, it is concluded that the phenomenon of overallcarryingsoil can be effectively avoided by reducing the friction coefficient of soil on the pipe under the premise that the soil resistance around the pipe cannot be changed.

Key words: shallowburied rectangular pipe jacking, overallcarryingsoil effect, cause analysis, treatment measures, field monitoring