Huangmugang Station of Shenzhen Metro line 14,existing line 7 and recently planned line 24 form a underground three line transfer station. The surrounding environment of the station is complex. The research priorities of this station is how to integrate various boundary conditions to form a scheme with perfect building function, economic and safe structure, and with the least impact on the surrounding environment, especially the research on station position and transfer function. During the scheme design process, by sorting out boundary conditions such as surface buildings, underground structures, surface traffic, area planning, engineering geological conditions, passenger flow prediction and station transfer function, the important and difficult points of Huangmugang Station, such as safety of overpass, traffic relief, pipeline modification, construction method, construction equipment selection, station position and transfer function are summarized. The method of breakthrough term by term is adopted to finally put forward the node transfer scheme of "dry" type, in which line 14 adopts the double side station with three floors underground to form parallel and same platform transfer with line 7, and forms platformplatform transfer with line 24.
Key words: metro station, design boundary conditions, station location selection, three line transfer scheme, scheme comparison
CLC Number:
U 452
HU Jianguo, LUO Congwu, CHEN Hong. Threeline Transfer Scheme of Huangmugang Station of Shenzhen Metro Line 14[J]. Tunnel Construction, 2019, 39(4): 633-641.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2019.04.014
http://www.suidaojs.com/EN/Y2019/V39/I4/633
Research and Application of Prefabricated Structure Construction Technology for Metro Station
Mechanical Property Analysis of Top Arch Joint for Prefabricated Underground Metro Station Structure Based on Insuit Monitoring
Processing Quality Inspection and Installation Accuracy Prediction of Prefabricated Metro Components
Design Technology of Outdoor Fire Hydrant Systems in Underground Metro Stations
Support Scheme for Deep Foundation Pit of Metro Station with Connection Gallery in Soft Soil
Deformation Monitoring and Analysis of a New Composite Retaining Structure for Deep Foundation Pit of a Station Adjacent to a River
Settlement Control Technology in Metro Station Construction with Large Cross-Section Rectangular Pipe Jacking Method: a Case Study of
Jing′an Temple Station of Line No.14 of Shanghai Metro
Replacement Technology of ConcreteFilled Steel Tubular Columns in Method Station Excavated by CutandCover TopDown Method