ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2019, Vol. 39 ›› Issue (S2): 141-146.DOI: 10.3973/j.issn.2096-4498.2019.S2.018
Previous Articles Next Articles
GUO Lu1, LI Jing2, ∗, WANG Dongyuan2, HAN Ying2
Received:
Online:
Published:
Abstract:
In order to explore the impact of settlement caused by pumping on subway system, three dimensional seepagestress coupled numerical simulation method is used to simulate the settlement caused by confined water exploitation and to study its influence on the station-tunnel system in the soft soil area in Binhai district of Tianjin. Under certain assumptions, the settlement between different parts of metro station-tunnel system and the stress concentration caused are quantitatively analyzed. The results show that: (1) Compression and settlement in confined water layer is the largest, and compression decreases upwards and downwards; (2) When settlement occurs, station structure has certain resistance, while tunnel structure′s resistance is weaker, which causes differential settlement in tunnel near station and large stress concentration at the top of tunnel about 2 m near the station.
Key words: surface settlement, station-tunnel connection, confined water exploitation, tunnel structure, three dimensional seepage-stress coupled finite element model
CLC Number:
U 456
GUO Lu, LI Jing, WANG Dongyuan, HAN Ying. Simulations for Effect of Confined Water Exploitation on Subway Station-tunnel System in Binhai Area of Tianjin[J]. Tunnel Construction, 2019, 39(S2): 141-146.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2019.S2.018
http://www.suidaojs.com/EN/Y2019/V39/IS2/141