Abstract:
The jacking experiment is carried out on pipecurtain group with inner interlock joints adjacent to Tianlinlu Project in Shanghai crossing underneath pipe curtainbox culvert section, so as to study the feasibility and safety of inner interlock joints. The curtain pipe stiffness, interlock stiffness and curtain pipe jacking sequence, jacking excavation and attitude controlling technology, and jacking lubrication and jacking force control are studied by numerical simulation method. The experiment and simulation results show that: (1) With the help of inner interlock joints, the accurate attitude control, smooth curtain pipe closure, and good water proofing performance can be guaranteed. (2) The curtain pipes with inner interlock joints have sufficient stiffness. (3) The boring machines, deviation controlling system and backup system adopted can precisely control the pipe curtain jacking with axis deviation within ±1 cm. (4) The inner interlock joints have effective guiding effect in the experiment.
Key words: pipecurtain group, inner interlock joints, ANSYS numerical simulation, attitude controlling technology, stiffness
CLC Number:
U 455
XIN Zhenggang. Experimental Study on AttitudeInterlock Control Technology of Pipecurtain Group with Inner Interlock Joints[J]. Tunnel Construction, 2020, 40(1): 43-49.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.01.006
http://www.suidaojs.com/EN/Y2020/V40/I1/43
Influence of Different Boundary Conditions on Mechanical Properties of SpecialShaped Shield Segment Joint
Structural Optimization of Elastic Supported Block Ballastless Track in HeavyHaul Railway Tunnels
Calculation and Analysis Method of Overall Action Effect of OpenCut Prefabricated Tunnel Structures
Damage and Deformation of Chebei Road Immersed Tunnel Based on Multiple Lateral Differential Foundation Stiffness
Influence of Soil Parameters on Response of Shield Tunnel Lining Considering SoilStructure Interaction
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink