ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2020, Vol. 40 ›› Issue (3): 417-425.DOI: 10.3973/j.issn.2096-4498.2020.03.015
Previous Articles Next Articles
ZHU Pengjin, ZHAO Kanglin∗, XIAO Lixing
Received:
Online:
Published:
Abstract: The TBM used in Qingdao Metro Line No. 8 laterally moved and advanced without load for several times. As a result, a new type of hydraulic shifting equipment for full-face TBM is developed based on the disadvantages of lateral moving and advancing without load of TBM by "track first and then thrust" method, i. e. low efficiency, great amount of preparation, high precision requirement and great risk of process change. The gear system, eletrohydraulic control driving force and turning and guiding system are added to the equipment to improve the bearing capacity, driving force, gear strength, ground bearing capacity and planeness. The synchronous lateral moving and advancing without load of the TBM can be realized, the working process change time can be reduced, the working efficiency can be improved and the construction risk can be reduced by using the equipment. The results can provide reference for similar shield/ TBM tunneling projects in the future.
Key words: shield, TBM, lateral moving, advancing without load, station crossing, hydraulic shifting, gear, turning; guiding
CLC Number:
U 453
ZHU Pengjin, ZHAO Kanglin, XIAO Lixing. Development and Application of Equipment for Lateral Moving and Advancing without Load of TBM[J]. Tunnel Construction, 2020, 40(3): 417-425.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.03.015
http://www.suidaojs.com/EN/Y2020/V40/I3/417
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink