Tunnel Construction ›› 2020, Vol. 40 ›› Issue (8): 1203-1210.DOI: 10.3973/j.issn.2096-4498.2020.08.014

Previous Articles     Next Articles

Mechanized Construction Technology for Large Crosssection Longchang Highway Tunnel in Grade Ⅳ Surrounding Rock

HUANG Weike, CHEN Jiabao, ZHANG Libin, MA Jianyun   

  1. (CCCCSHB Sixth Engineering Co., Ltd., Xian 710075, Shaanxi, China)
  • Online:2020-08-20 Published:2020-09-03

Abstract: The construction of highway tunnels in China is characterized by manual operation, low mechanization degree, long process cycle time, slow construction progress and high safety risk. Hence, large crosssection construction method is proposed for Longchang Tunnel on GuiyangHuangping Expressway based on Chinese standards and the design concept of NATM in Europe. The "9+N" equipments, i.e. tripleboom rock drilling jumbo, arch anchor installation trolley, etc. + multifunctional geological drilling machine and automatic grouting machine, etc.KG-*3, and corresponding construction technologies are adopted to carry out seamless tunnel construction. The results show that "9+N"construction technology recommended can reduce the labor consumption and impact on surrounding environment, improve the mechanization degree and construction efficiency, and guarantee the construction safety and quality.

Key words: highway tunnel, mechanized construction, large rosssection construction method, NATM