Tunnel Construction ›› 2021, Vol. 41 ›› Issue (6): 1058-1064.DOI: 10.3973/j.issn.2096-4498.2021.06.019
Previous Articles Next Articles
LYU Jianle
Online:
Published:
Abstract: To improve the applicability of tunnel boring machine (TBM) excavation in the weak surrounding rock and fault fracture zone and effectively cope with the problems caused by the convergence and deformation of the surrounding rock, such as beyondlimit deformation and TBM jamming, five targeted overcutting designs, namely, hydraulic over cutter, outward movement of gauge disc cutter, reserved over cutter housing, main drive eccentricity design, and changing cutterhead side block are compared based on the application of TBMs in Qinling Tunnel, DaliRuili Railway and other projects, and the application characteristics, and applicable TBM types of different overcutting methods are concluded. It is concluded from the above research that: (1) the hydraulic over cutter can be used alone and is suitable for shortdistance overcutting, whereas the other four methods are all suitable for longdistance overcutting; (2) when the overcutting volume needs to be greater than 50 mm in the radial direction, both the outward movement of gauge disc cutter and the lifting of cutterhead must be conducted simultaneously; (3) the maximum overcutting volume in the radial direction shall not exceed 100 mm, and a larger overcutting volume must be achieved by changing cutterhead side blocks; and (4) with the development of TBM technology, the easier overcutting method with an overcutting volume of more than 100 mm in the radius direction should be further studied in the future.
Key words:  , tunnel boring machine, overcutting method, hydraulic over cutter, main drive eccentricity, over cutter housing
CLC Number:
U 45
LYU Jianle. Comparison and Analysis of Tunnel Boring Machine Overcutting Methods[J]. Tunnel Construction, 2021, 41(6): 1058-1064.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.06.019
http://www.suidaojs.com/EN/Y2021/V41/I6/1058
Stress Characteristics of ConcreteFilled Steel Tubular Column and Surface Deformation in PileBeamArch Station with Different RiseSpan Ratios of Arch:
a Case Study of Xiangheyuan Station on Beijing Metro Line 17
Impact of Lining Support Cancellation for #1 Inclined Shaft of Qinling Tiantaishan Tunnel
Research on Layout Technology of Semi-Universal Ring Segments for Rectangular Shield Tunnel
Potential Assessment on Integrated Development of Urban Underground Space in New Era
Comparative Analysis of Air Demand Calculation of Highway Tunnel between China’s Ventilation Design Rules 2014 and Foreign PIARC 2019 Standards
Reasonable Application, Damage Causes Analysis, and Optimization Techniques of Tunnel Boring Machine Disc Cutters in Bid 2 Project of Lanzhou Water Source