ISSN 2096-4498
CN 44-1745/U

ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2021, Vol. 41 ›› Issue (7): 1197-1205.DOI: 10.3973/j.issn.2096-4498.2021.07.014
Previous Articles Next Articles
Protection Scheme for Shallow Buried Fourth Track Tunnel with Large Cross Section Passing beneath a Utility Tunnel: a Case Study on GuangzhouFoshan Intercity Passing beneath Huakang Road Utility Tunnel
JI Yanlei1, 2
(1. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China; 2.Shaanxi Railway and Underground Traffic Engineering Key Laboratory (FSDI), Xi′an 710043, Shaanxi, China)