ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2021, Vol. 41 ›› Issue (S1): 146-.DOI: 10.3973/j.issn.2096-4498.2021.S1.018

Previous Articles     Next Articles

Analysis of MultiCavity Effect of Tunnel Anchor in Chengdu Bank of Dadu River Bridge on SichuanTibet Railway

YANG Zhao1, 2, YUAN Qing1, 3, *, YANG Lin1, 2, XIONG Qihuan1, 3, ZHANG Ziping1, 2   


  • Online:2021-07-30 Published:2021-08-27

Abstract:

 

CLC Number: