ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2021, Vol. 41 ›› Issue (S1): 232-.DOI: 10.3973/j.issn.2096-4498.2021.S1.029

Previous Articles     Next Articles

Research on Influencing Factors of Mechanical Properties of Tunnel Lining Structure with SprayApplied Waterproofing

HE Bin1, JIANG Yajun1 *, ZHAO Jumei1, LIU Jitai1, WANG Huqun2   

  1. (1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. State Key Laboratory of Special Functional Waterproof Materials, Beijing Oriental Yuhong Waterproof Technology Co., Ltd., Beijing 101309, China)
  • Online:2021-07-30 Published:2021-08-29

Abstract: It is important to study the synergistic stress mechanism and its influencing factors of primary and secondary lining with sprayapplied waterproofing and provide reasonable parameters for lining structure design. A loadstructure calculation model is established based on uniaxial tensile, bonding tensile and shear tests of sprayapplied waterproofing lining, and the influence factors and action rules of the mechanical properties of sprayapplied waterproofing lining structure are studied. In the numerical model, according to the measured data, tunnel lining structure are simulated with different thickness of waterproof film, different interface parameters and thickness of secondary lining. The results show that: (1)The thickness of waterproof film has little effect on the mechanical properties of lining structure. (2)Different interface parameters have significant effect on the stress and displacement of lining structure, i.e.KG-*3, with the increase of interface parameters, the primary stress decreases while the stress of the secondary lining increases, the stress difference between the two decreases, and the synergistic force capacity of the lining structure increases. (3)Thickness decrease of secondary lining will reduce its safety factors, but is still within the limit value of the specification. 

 Therefore, the structural design of secondary lining can be further optimized.

Key words: tunnel engineering, lining structure, sprayapplied waterproofing, waterproof film, parameters of interface, optimization of secondary lining

CLC Number: