Tunnel Construction ›› 2021, Vol. 41 ›› Issue (S2): 398-407.DOI: 10.3973/j.issn.2096-4498.2021.S2.051

Previous Articles     Next Articles

Research and Application of Underpinning Technology of Pile Foundation by Longitudinal WallBeam in Mined Tunnel

TU Zhiyi1, CHEN Tao2   

  1. (1. Zhejiang Institute of Communications Co.〖KG-*3, Ltd.KG-*3, Hangzhou 310030, Zhejiang, China; 2. China Railway Eryuan Engineering Group Co.KG-*3, Ltd.KG-*3, Chengdu 610000, Sichuan, China)
  • Online:2021-12-31 Published:2022-03-17

Abstract: The mined tunnel of Xiamen railway station of rail transit line 3 is 34.5 m in width and 11.7 m in depth. The tunnel crosses underneath Wucun commercial underground street, and the double lines laterally cross the BRT piers. Accordingly, the existing pile foundations of the stress and piers should be underpinned. As a result, countermeasures are put forward as follows: (1) The longitudinal wallbeam underpinning scheme is adopted to transfer the load of the underground street to the completed station structure and wall beams. (2) The reinforcements are embedded in special joints between the underpinning beams and the existing piles, and the tongues and grooves are cut. (3) The tunnel is supported by anchor bolts, and the weak soil layer on the sidewalls is grouted and reinforced. (4) The existing antifloating anchor bolts are removed and pipe roof is arranged within the tunnel entrance and exit. The measures adopted have effectively reduced the impact of tunnel construction on underground street and the safety of the tunnel, and the existing structures have been ensured. Finally, the numerical simulation results show that the longitudinal wallbeam system is reasonable, feasible, and safe.

Key words: mined tunnel, crossing project, underground street, pile foundation underpinning, longitudinal wallbeam system