ISSN 2096-4498
CN 44-1745/U

ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2022, Vol. 42 ›› Issue (8): 1428-1434.DOI: 10.3973/j.issn.2096-4498.2022.08.012
Previous Articles Next Articles
Application of LongDistance Construction and Transportation Model of Earth [JP3]Pressure Balance Shield Used in Phase 1 Project of Beijing Metro New Airport Line
YANG Zhiyong1, BAI Zhiqiang1, LI Yuankai2, 3,
GAO Hongji4, JIANG
Yusheng1, SUN Wei4, SUN Zhengyang1, 5
(1.School of Mechanics and Civil Engineering,China University of Mining and Technology Beijing,Beijing 100083,China;2.Beijing MTR Construction Administration Corporation,Beijing 100068,China;3.Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit, Beijing 100068,China;4.China Railway 14th Bureau Group Corporation Limited,Jinan 250014,Shandong,China;5.Postdoctoral Program Beijing Urban Construction Group Co.,Ltd.,Beijing 100088,China)