[1] |
ZHOU Jianjun, CAI Guangyuan, SUN Feixiang, PENG Zhengyong, GUO Rui, ZENG Shuai, SHI Rongjian.
Numerical Simulation on Flexural Mechanical Properties
of Steel TubeFrozen Soil Composite Structure
[J]. Tunnel Construction, 2022, 42(S1): 40-47.
|
[2] |
ZHENG Ligang, CHANG Longfei, JIANG Hua, JIANG Yusheng.
Stress Characteristics of ConcreteFilled
Steel Tubular Column and Surface Deformation in PileBeamArch
Station with Different RiseSpan Ratios of Arch:
a Case Study of
Xiangheyuan Station on Beijing Metro Line 17
[J]. Tunnel Construction, 2022, 42(S1): 174-182.
|
[3] |
SHUAI Yubing, QIU Jinrun, LI Pengfei, WANG Limin, WANG Hao, WANG Xijun, ZHANG Mingju.
Experimental Study and Numerical Simulation of Bottom
Sealing of Shaft Pump Room in Shield Tunnel Constructed by
Mechanical Method
[J]. Tunnel Construction, 2022, 42(S1): 128-135.
|
[4] |
LI Xia, YANG Xiuren.
Comparative Analysis of Internal Forces of
Prefabricated and CastinPlace Metro Station Structures under Horizontal Earthquake
[J]. Tunnel Construction, 2022, 42(S1): 147-154.
|
[5] |
ZHANG Yuqi, QIU Yunjun, GUO Jiantao, WANG Qiangxun, SU Shouyi, RAO Bangzheng.
Design and Application of PileStyle
Reinforcement for Underground Diaphragm Wall under
Narrow Site Condition
[J]. Tunnel Construction, 2022, 42(S1): 389-395.
|
[6] |
LI Yang, CHENG Peng, LI Peng, WANG Ning, LUO Changming, BI Chengcheng.
Research on Construction Technology for SmallRadius
Curved PipeCurtain Mined
Metro Stations
[J]. Tunnel Construction, 2022, 42(7): 1207-1218.
|
[7] |
SUN Xibo, LIU Hongxiang, LI Pengfei, GUO Caixia.
Punching Shear Failure of WaterResistant
Rock Mass of Tunnel Crossing WaterRich Fault
[J]. Tunnel Construction, 2022, 42(6): 984-993.
|
[8] |
ZHU Yeting, ZHANG Zixin ZHU Yanfei.
Influence of Different Boundary Conditions on
Mechanical Properties
of SpecialShaped Shield Segment Joint
[J]. Tunnel Construction, 2022, 42(6): 1003-1013.
|
[9] |
LI Qing, ZHU Zhiheng, LI Linyi.
Mechanical Analysis of Lining Failure in a Karst
Highway Tunnel due to Heavy Rainfall
[J]. Tunnel Construction, 2022, 42(6): 1102-1110.
|
[10] |
XIAO Mingqing, YU Xiongbing, XUE Guangqiao, ZHANG Chaoyong.
Waterproofing Mechanism of Double Seal Gaskets
Considering Breakdown Water Pressure
[J]. Tunnel Construction, 2022, 42(5): 791-797.
|
[11] |
WANG Kai, ZENG Chuigang, LI Zhiguo.
Load Calculation and Analysis of SuperLargeDiameter Slurry Shield Tunneling in SoilRock Interbedded Strata
[J]. Tunnel Construction, 2022, 42(5): 873-881.
|
[12] |
YUAN Peng, WEI Lifeng, HE Xiaobin.
Deformation Control of Pile Foundation Laterally
Crossed by a SuperLargeDiameter
Shield near Yellow River Embankment: a Case Study of
Yellow Rivercrossing Tunnel on Jiluo Road in Jinan,
China
[J]. Tunnel Construction, 2022, 42(5): 907-916.
|
[13] |
WANG Shimin, PENG Xiaoyu, CHEN Bing, WANG Xianming, RUAN Lei.
Surrounding Rock Stress Release Rate of Shield Tunnel
in UpperSoft and LowerHard Strata
[J]. Tunnel Construction, 2022, 42(4): 594-601.
|
[14] |
YANG Xiuren.
Research and Application of Prefabricated Structure Construction
Technology for Metro Station
[J]. Tunnel Construction, 2022, 42(3): 345-354.
|
[15] |
TAO Lianjin, CAO Qiankun, SHI Cheng, DING Peng.
Seismic Responses of Prefabricated Metro Stations
Built at Different Sites
[J]. Tunnel Construction, 2022, 42(3): 378-387.
|