Review and Prospects of Drilling and Blasting Tunnel Construction Technology in China

TAN Zhongsheng1, WU Jingang1, 2, *   

  1. (1. Beijing Jiaotong University, Beijing 100044, China; 2. Beijing General Municipal Engineering Design & Research Institute Co., Ltd., Beijing 100082, China)
  • Online:2023-06-20 Published:2023-07-14

Abstract:  With the continuous development of the economy, the improvement of the comprehensive national strength, and the application of high and new technologies, the drilling and blasting(D&B) tunnel construction technology has achieved unprecedented rapid development in China. In this paper, in order to sum up relevant experience for reference in subsequent key and difficult projects, the D&B construction technology is reviewed and summarized, and its future application is prospected. Firstly, the development history of the D&B construction technology in China is reviewed, and five major technical breakthroughs are expounded in turn, including the adoption of the wet drilling, the introduction of the multiboom rockdrilling jumbo, the application of the emulsion explosives, the wide application of the Nonel detonator initiation system, and the application and popularization of the industrial digital electronic detonators. Then, the concept and method of D&B construction, the equipment matching for mechanized construction, and the state of art and development trend of relevant technologies are introduced, involving the ventilation technology for extralong tunnels and extralong tunneling distance, the construction technology for tunnels with extralarge cover and extremely complex geological conditions, the construction technology for extralong underwater tunnels with high water pressure, the construction technology for tunnels with extralarge crosssections and tunnel groups, and the technology of advance geological prediction. Finally, the problems that need to be solved in the future, such as the intelligent tunnel construction technology and the green and lowcarbon construction technology, are considered. The research shows that the D&B method has significant advantages in the construction of long tunnels with complex geological conditions, and will still play a major role in tunnel construction within a certain period of time. In the future, the focus shall be laid on the development of mechanized, intelligent, green, and lowcarbon construction technologies to further improve the efficiency and level of D&B construction.

Key words: tunnel engineering, drilling and blasting construction, New Austrian Tunneling Method, equipment matching for mechanized construction, longdistance ventilation, extremelycomplex geological environment, underwater tunnel, largecrosssection tunnel, advance geolgocial prediction, intelligent construction, green and lowcarbon construction