Comparative Analysis on Adaptability and Applications of DoubleShield Open Tunnel Boring Machines

DU Lijie1, ZHANG Zheng1, LI Qingwei1, ZHANG Weidong2, DU Chuanqi3, LIU Jiayi2, YANG Yalei1   

  1. (1.Shijiazhuang Tiedao University,Shijiazhuang 050043,Hebei,China;2.Sinohydro 11th Engineering Bureau Co.,Ltd.,Zhengzhou 450001,Henan,China;3.China Railway 18th Bureau Group Co.,Ltd.,Tianjin 300000,China)
  • Online:2023-06-20 Published:2023-07-14

Abstract:

To investigate the advantages and disadvantages of the new doubleshield open tunnel boring machines(TBMs) and compare them with the conventional mainbeam open TBMs, a case study is conducted on Beijiang water diversion project and Nabang hydropower station project bored by the two open TBMs. First, theoretical comparative analysis is conducted from the aspects of the main machine structure, rock support equipment layout, and construction advantages and disadvantages. Second, engineering application comparison is performed from the aspects of utilization rate of excavation time, construction speed, and geological adaptability. The results show the following: (1) Construction speed of both the TBMs is almost the same when tunneling in complete or relatively complete Grades and surrounding rocks. (2) For surrounding rocks of Grades and or fault fracture zones, the construction speed and adaptability of the doubleshield TBMs are comparatively poor. Therefore, the doubleshield open TBMs are recommended to be employed in smalldiameter tunnels with complete or relatively complete surrounding rocks or less fault fracture zones and tunnels with small curvature radius.

Key words: doubleshield open TBM, mainbeam open TBM, tunneling performance, adaptability