Construction Technology for Gushing Control by Using Opening Differential of Double Gate of Shield Screw Conveyor

DING Erwei1, 2, LUO Jiehua2, LIU Shaokai3, HUANG Jianghua2, WU Yong 2, 4YANG Xiangxiang5, REN Hui1, CHENG Shaogong1, 2, ZHAO Yunhui1, 2   

  1. (1. Zhejiang Huadong Surveying and Mapping and Engineering Safety Technology Co., Ltd., Hangzhou  310012,Zhejiang,China; 2. Huadong Engineering Corporation Limited, Hangzhou 310012, Zhejiang,China;3. Hefei Rail Transit Group Co., Ltd., Hefei 230001, Anhui, China; 4. Zhejiang Smart Rail Transit Engineering Technology Research Center, Hangzhou 310012, Zhejiang, China;[JP2]5. China Construction Eighth Engineering Division Rail Transit Construction Co., Ltd., Nanjing 210018, Jiangsu, China)

  • Online:2023-07-31 Published:2023-08-28

Abstract: In order to solve the gushing problem of shield screw conveyor caused by high pressure rich water in the waterrich sandy soil, sandy pebble, and upper soft and lower hard composite strata, according to the relationship and the inversely proportion principle between the flow rate that mud water passing through the gate and the cross section, a kind of construction technology is proposed. It adopts the opening differential of the double gates of screw conveyor to enlarge the cross section of deslagging and reduce the pressure step by step. The technology can ensure continuity of mucking for the screw conveyor during shield tunneling, which avoids the risks of the pileup in chamber caused by slag gushing, the cutterhead wear caused by loss of pressure, surface subsidence and so on. The technology was applied in the section between Mingxiu Road station and Xiuxiang station of Nanning metro line 2, realizing rapid and continuous excavation for shield tunneling in the sandy pebble waterrich strata, reducing the disturbance to the stratum and effectively controlling the ground subsidence. In all, the construction technology has obvious advantages in efficiency, economy, operability, safety, and practicability.

Key words: shield construction, opening differential, gushing control, pileup in chamber, double gate, stepbystep pressure reduction, stress characteristics