ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2026, Vol. 46 ›› Issue (5): 1096-1108.DOI: 10.3973/j.issn.2096-4498.2026.05.016
Previous Articles Next Articles
WANG Yi
Online:
Published:
Abstract:
Key words: shield tunnel, slurry circulation system, slurry hydraulic transportation, muck delayed discharge, water hammer impact
WANG Yi. Configuration Technology of an Ultra-Long-Distance Slurry Circulation System: A Case Study of Chongtai Yangtze River Tunnel[J]. Tunnel Construction, 2026, 46(5): 1096-1108.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2026.05.016
http://www.suidaojs.com/EN/Y2026/V46/I5/1096