Development and Application of a Full-Scale Structural Test Loading System for Steel Arch Support Structures of TBM Diversion Tunnels

GENG Qi1, YANG Runfeng1, WANG Lichuan2, 3, 4, *, ZHANG Huijian4, GUO Huichuan3, 5, WANG Jianwei3, 5, LIU Zhiqiang6   

  1. (1. Engineering Research Center of the Ministry of Education for Expressway Construction and Maintenance Equipment and Technology, College of Mechanical Engineering and Intelligent Equipment, Chang’an University, Xi’an 710064, Shaanxi, China; 2. Qilu Transportation School, Shandong University, Jinan 250061, Shandong, China; 3. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222, China; 4. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 5. China Railway 18th Bureau Group Tunnel Engineering Co., Ltd., Chongqing 400707, China; 6. China Railway Southwest Research Institute Co., Ltd., Chengdu 611731, Sichuan, China)
  • Online:2026-10-20 Published:2026-10-20

Abstract: A full-scale annular support model loading test system suitable for field application was developed to verify the structural reliability of the steel arch and polypropylene fiber-reinforced wet-mix shotcrete composite support structure used for rapid TBM water-diversion tunnel support. Multicondition step-by-step loading tests verified the long-term reliability of the loading system and the overall load-bearing performance of the support structure. A full-scale steel arch and polypropylene fiber-reinforced wet-mix shotcrete composite support structure model with an outer diameter of 7.8 m, a wall thickness of 0.23 m, and a height of 3 m was fabricated. The loading system comprises a 3-m-high reaction wall system, 24 independent hydraulic loading systems with force transmission mechanisms, and a programmable logic controller-based closed-loop servo master control system. Twenty-four loading points were arranged circumferentially, each loaded by two hydraulic cylinders through a load-distributing beam. The maximum stroke and thrust of each cylinder were 200 mm and 2 000 kN, respectively. Furthermore, the transfer function of the hydraulic loading and control system was established, and particle swarm optimization was used to optimize the proportional-integral-derivative control, yielding recommended proportional, integral, and derivative coefficients of 20, 6, and 2, respectively. After optimization, the overshoot decreased to 1%. The developed system reliably performed step loading, load holding, unloading, and automatic unloading under instability. Loading verification tests show that (1) the average load error across the 24 synchronized systems under simultaneous annular loading at 600-1 300 kN was below 3%; for Grade Ⅴ surrounding rock support structures, 14-level nonuniform loading tests yielded relative errors generally below 3% at levels 6-11, with a minimum of 1.3%; (2) cracks occurred mainly at measuring points #3, #12, #18, and #22, and the final failure was shear, with a maximum concrete axial force of 4 244 kN and a maximum steel arch compressive axial force of 1 070 kN; and (3) the design loads of the support structures for Grades Ⅲ, Ⅳ, and Ⅴ surrounding rock were 47 520, 51 360, and 57 120 kN, respectively, with safety factors of 4.2-4.3. The steel arch and polypropylene fiber-reinforced wet-mix shotcrete composite support structure designed for Grade Ⅴ surrounding rock exhibited a load-bearing capacity 1.35 times the design load and good deformation flexibility. The system’s control accuracy meets full-scale test requirements.

Key words: TBM water-diversion tunnel, steel arch support structure, full-scale test, hydraulic loading system, proportional-integral-derivative control