Innovative Design and Technical Path of a Smoke Exhaust System for an Extra-Long Submarine Tunnel

CHEN Yuyuan1, 2, MEI Fangchen1, 2, CHE Lunfei1, 2, LIU Jian1, 2, ZI Yi1, 2, SUN Wenhao1, 2, LI Sha3, JIANG Xuepeng4   

  1. (1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China; 2. National and Local Joint Engineering Research Center for Underwater Tunnel Technology, Wuhan 430063, Hubei, China; 3. Wuhan Municipal Engineering Bidding Design Cost Service Center, Wuhan 430015, Hubei, China; 4. School of Resources and Environmental Engineering, Wuhan University of Science and Technology, Wuhan 430081, Hubei, China)
  • Online:2026-10-20 Published:2026-10-20

Abstract: Smoke extraction systems for extra-long submarine tunnels (>20 km) represent a substantial technical challenge. Therefore, an innovative smoke exhaust system was developed based on reducing fresh air entrainment and lowering air duct pressure, and its safe, reliable, and highly efficient performance was  verified. First, theoretical calculations and three-dimensional numerical simulations of fire dynamics are used to construct a multi-index constrained evaluation model that includes the smoke spread range, upstream backflow length, evacuation environment, and smoke exhaust efficiency. Next, a large-spacing point-type smoke exhaust scheme with an exhaust vent spacing of more than 60 m is developed. This scheme integrates upstream longitudinal ventilation with a downstream water curtain flexible smoke isolation system to restrain upstream smoke spread and reduce downstream air supply. Finally, an optimized scheme of interconnecting smoke ducts and series fan rooms is developed to increase the length of the smoke exhaust path, distribute the air volume of a single path, optimize the air pressure distribution in the air ducts, and reduce the air duct resistance and air leakage rate. The simulation and calculation results show the following: (1) Under a 50 MW heat load, the flexible smoke isolation system with two rows of water curtain nozzles activated achieves a smoke blocking efficiency of 82.05%, a heat insulation efficiency of 96.83%, and a cooling efficiency of 61.32%. (2) The large-spacing point-type smoke exhaust combined with water curtain isolation increases the smoke exhaust efficiency of the system to 98.16%. (3) With the addition of interconnecting smoke ducts and series fan rooms, the maximum length of the smoke exhaust section can be extended to 22.8 km. The temperature at a height of 2 m above the tunnel floor stabilizes at 20 ℃, visibility meets the evacuation requirement of more than 10 m, and the upstream smoke backflow length is controlled within 30 m.

Key words: submarine tunnel, smoke exhaust system, large-spacing point-type smoke exhaust, water curtain flexible smoke isolation, interconnecting smoke duct, series fan room, fire dynamics simulator