ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2005, Vol. 25 ›› Issue (5): 28-30,34.

• wenzhang • Previous Articles     Next Articles

nalysis |and |Study on |Gauge |Survey of An Existing |Tunnel

JIANG Qiang-Bin   

  1. Harbin |Rail |Transit |Construction |Office, |Harbin, Heilongjiang |150018,China
  • Received:2005-05-19 Online:2005-10-20 Published:2009-12-19

Abstract:

Through surveying of and gauge analysis on 7381 existing tunnel, the gauges of the trains and the technical parameters of the alignment of phase Ⅰ of the rail transit systems of Harbin city is preliminary determined, which can provide reference for costsaving and more efficiency achieving in the construction of the Metro systems and for the feasibility study and design of the Metro systems.

Key words: tunnel , survey , gauge , analysis  preliminary , study