[1] |
ZHAN Chao.
Experimental Effect Prediction of Ground Conditioning
of Water rich Sandy Stratum Based on BP Neural Network
[J]. Tunnel Construction, 2020, 40(7): 988-0996.
|
[2] |
ZHANG Li, SU Rui, HE Chuan, FENG Kun, FANG Ruoquan, XU Peikai.
Fullscale Experimental Study on Bending
Performance of Segmental Joints of Large
Crosssection Shield Tunnel under Pure Compressive Bending Condition
[J]. Tunnel Construction, 2020, 40(7): 997-1003.
|
[3] |
ZHANG Tongsong.
Study on Scheme of Tshaped
Metro Transfer Station with Part Route
[J]. Tunnel Construction, 2020, 40(7): 1011-1016.
|
[4] |
DU Yu.
Research on Several Rehabilitation and Expansion
Schemes Related to Civil Works for Operating Metro Stations
[J]. Tunnel Construction, 2020, 40(7): 1017-1028.
|
[5] |
YAO Yanming, HU Xinpeng, LI Fayong, XIAO Guangliang, HUANG Yi, XIA Hanyong, ZHOU Junhong.
Construction Technology and Application of
Disassembled Shield Passing Through Station in Confined Space: a
Case Study on Ningbo Railway Station
[J]. Tunnel Construction, 2020, 40(7): 1035-1040.
|
[6] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[7] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[8] |
WU Xianguo, WANG Lei, CHEN Hongyu, ZHANG Limao, ZHANG Kainan.
Design and Realization of Health Monitoring System for
Operation Metro Structure Based on BIM based Internet
of Things
[J]. Tunnel Construction, 2020, 40(6): 905-914.
|
[9] |
ZHANG Yazhou.
Numerical Simulation on Waterproof Capacity of Shield Tunnel
Joints Considering Working State of Sealing Gasket Surface
[J]. Tunnel Construction, 2020, 40(6): 813-820.
|
[10] |
WU Fengbo, JIN Huai, YANG Qiyan, ZHENG Weiqiang.
Analysis of Ground Transverse Settlement Groove Parameters of Beijing Metro Tunnel
[J]. Tunnel Construction, 2020, 40(5): 660-671.
|
[11] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|
[12] |
LUO Wenjing, ZOU Chenglu.
Key Technologies and Numerical Analysis of Metro Station by Cut-and-cover and Mining Method at Semi-diagenetic Stratum in Nanning
[J]. Tunnel Construction, 2020, 40(5): 727-734.
|
[13] |
LI Tiesheng.
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
[J]. Tunnel Construction, 2020, 40(4): 531-537.
|
[14] |
JIN Yuelang, DING Wenqi, XIAO Mingqing, SUN Wenhao, WU Weifeng, YE Meixi, TU Xinbin.
Experimental Research on Sealing Behavior of Segmental Joints of
Sutong GIL Utility Tunnel under Ultra-high Water Pressure
[J]. Tunnel Construction, 2020, 40(4): 538-544.
|
[15] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|