ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2005, Vol. 25 ›› Issue (5): 68-70.

• wenzhang • Previous Articles     Next Articles

Discussion on Construction Setting-out Survey of Railway Plane Curves

DI Zhi-Gang   

  1. Beijing Branch of China Railway Tunnel Group, |Beijing |100022|China
  • Received:2005-04-18 Online:2005-10-20 Published:2009-12-19

Abstract:

On basis of the features of the center line of the railway alignment, the author describes the methods of calculation and treatment of the lateral movement of the adjustment curves and the center line of the railway alignment at curved section, placing emphasis on the derivation of the calculation formula of the transition of the curves. The author also provides a new calculation method.