ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (1): 10-13.DOI: A
• wenzhang • Previous Articles Next Articles
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng
Received:
Revised:
Online:
Published:
Abstract:
On basis of the results of the monitoring and measurement of Huangzhuang station of line No. 4 and No. 10 of Beijing Metro, the article summarizes the reasons and regular pattern of ground surface settlement and crown subsidence of Huangzhuang station of line No. 4 of Beijing Metro constructed by shallowburied undercutting method, and presents relevant countermeasures to control the settlement. The article can provide guidance for the construction of similar works in the future.
CLC Number:
 
U455.4
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng. Analysis on and Control of Settlement in Metro Construction[J]. Tunnel Construction, 2006, 26(1): 10-13.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2006/V26/I1/10