ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (1): 14-17.DOI: A
• wenzhang • Previous Articles Next Articles
WANG Wen-Tong, ZHANG Xiang-Duo
Received:
Online:
Published:
Abstract:
Opencut slopes of 1:0.3 gradient reinforced by soil nails and prestressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro. On basis of the requirements of the design and construction of the station, ground surface settlement, horizontal displacement of ground, stress of soil nails and anchoring cables, water table and rebound of foundation floor are monitored. By means of analysis on and prediction and feedback of the monitoring results, reliable reference can be provided for the informationaided design and construction of Metro stations.
CLC Number:
 
TU921
WANG Wen-Tong, ZHANG Xiang-Duo. Analysis on Monitoring Results of Opencut Metro Stations Reinforced by Soil Nails and Anchoring Cables[J]. Tunnel Construction, 2006, 26(1): 14-17.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2006/V26/I1/14