ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (1): 14-17.DOI: A

• wenzhang • Previous Articles     Next Articles

Analysis on Monitoring Results of Opencut Metro Stations
Reinforced by Soil Nails and Anchoring Cables

WANG Wen-Tong, ZHANG Xiang-Duo   

  1. China Railway Tunnel Survey &|Design Institute Co.| Ltd.
  • Received:2005-08-15 Online:2006-02-20 Published:2010-01-26

Abstract:

Opencut slopes of 1:0.3 gradient reinforced by soil nails and prestressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro. On basis of the requirements of the design and construction of the station, ground surface settlement, horizontal displacement of ground, stress of soil nails and anchoring cables, water table and rebound of foundation floor are monitored. By means of analysis on and prediction and feedback of the monitoring results, reliable reference can be provided for the informationaided design and construction of Metro stations.

CLC Number: