ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (1): 53-55.DOI: B
• wenzhang • Previous Articles Next Articles
XU Jun-Zhe
Received:
Online:
Published:
Abstract:
Complete and detailed geology exploration by means of borehole drilling in the job site is one of the necessary and effective measures taken during the construction of municipal underground works. During the construction of river/sea crossing tunnels, nonstandard geology exploration may cause lots of hidden troubles to tunnel construction or tunnel structures. In connection with engineering practice, the article describes the harm on the tunnel construction induced by geology exploring borehole drilling in water, which can provide reference for similar works.
CLC Number:
U455
XU Jun-Zhe. Discussions on Potential Harm of Geology Exploring Borehole Drilling on Tunnel Construction[J]. Tunnel Construction, 2006, 26(1): 53-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I1/53