ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (1): 91-92,104.DOI: B
• wenzhang • Previous Articles Next Articles
XU Yong-Hu
Received:
Online:
Published:
Abstract:
The construction of the waterproofing layers is the last step of the construction of the elevated bridges of MRT system. The design and construction quality of the waterproofing layers are closely related with the durability and operation safety of the elevated bridges. The article describes the design and construction of the base layers, waterproofing paints and protection layers of the monolithic roadbeds of the elevated bridges of Jinbin light rail project.
CLC Number:
U445.4
XU Yong-Hu. Construction Technology of Waterproofing Layers of Elevated Nonballast Bridge of Jinbin Light Rail[J]. Tunnel Construction, 2006, 26(1): 91-92,104.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I1/91