Tunnel Construction ›› 2006, Vol. 26 ›› Issue (2): 27-29.DOI: B

• wenzhang • Previous Articles     Next Articles

Design and Construction of Fullbreadth Invert Bridges Adopted in
Construction of Baozhen Tunnel with Railbound Hauling System

ZHANG Qun-Jian   

  1. YichangWanzhou railway project, the No.1 Engineering Corp., Ltd., the No.5
    Bureau Group, C.R.E.C.
  • Received:2005-12-05 Revised:2006-01-25 Online:2006-04-20 Published:2009-12-09

Abstract:

On basis of the construction of Zhenbao tunnel on YichangWanzhou railway, the article introduces the design and construction of fullbreadth invert bridges adopted in the construction of the tunnel, in which railbound hauling system is adopted. By means of the introduced invert bridge, fullbreadth invert concrete casting is conducted with the present machinery and equipment. The article provides references both for the promotion of fullbreadth invert concrete casting and for the elimination of the operation diseases of tunnels.