Abstract:
On basis of the construction of the ultrashallowburied portion of Kunlunshan tunnel of Qingzang railway (from DK977+600 to DK977+660), the article describes the effects of the following measures in the tunnel construction: surface consolidation grouting, freezing/thawing prevention by means of sun shading, pregrouting by means of small pipes installed around the tunnel arch, weak blasting, shotcreting and monitoring. Furthermore, the article also describes the freezing/thawing prevention construction techniques, the waterproofing and drainage construction techniques and the technique of thermal rods as specially taken to consolidate the freezing ground.
CLC Number:
U455.49
PAN Meng-Shan. Construction Technology of Ultrashallowburied Portion of Kunlunshan Tunnel[J]. Tunnel Construction, 2006, 26(2): 68-70,73.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I2/68