Tunnel Construction ›› 2006, Vol. 26 ›› Issue (2): 82-86.DOI: A
• wenzhang • Previous Articles Next Articles
LIU Dian-Yong, ZHANG Ning-Chuan
Received:
Revised:
Online:
Published:
Abstract:
On basis of the temperature measurement results and the technical parameters of the EPB shield tunnel boring machine of 6250 diameter used in line 2 of Guangzhou Metro, the article makes a simple calculation of the heat balance of the shield TBM to obtain a simple description of the heat dissipation process of the shield driven Metro tunnel, which can be used to provide reference for similar projects in the future.
CLC Number:
U455.3+1
LIU Dian-Yong, ZHANG Ning-Chuan. Calculation and Analysis of Heat Balance of Boring of Shield TBMs[J]. Tunnel Construction, 2006, 26(2): 82-86.